What was found
FWD CARGO BAY FLOOR TO SIDEWALL PANEL HAS DAMAGE AT A FASTENER HOLE AT BS 416 RBL 23 WL 156 ; / [01] EVALUATED DAMAGE ON FCB SIDEWALL SUPPORT R/H BS416 RBL23; 100% MATERIAL LOSS; OUT OF LIMITS PER SRM 53-00-53-1A-2; [02] VERIFIED OUT OF LIMITS; [03] VERIFIED OUT OF LIMITS.; [04] VERIFIED OUT OF LIMITS FROM STEP 1.; [05] REMOVED FCB FLOOR TO SIDEWALL SUPPORT BS396-BS420 RBL23 IAW SRM 51-40-02-0G-0; [06] LOCATED; DRILLED; AND COUNTERSANK NEW FLOOR TO SIDEWALL SUPPORT IAW SRM 51-40-05-0G-0; SRM 51-40-08-0G-0; AND DWG 143A7501 REV : A; [07] MATERIAL USING BAC1496-444#7075T62 .040' LOT#1457306-1 IAW SRM 53-30-53-01-2; [08] APPLIED CHEMICAL CONVERSION COATING AND PRIMER IAW SRM 51-20-01-0G-0 AND SOPM 20-41-02; [09] VERIFIED; [10] VERIFIED STEPS 5-8 OK TO INSTALL; [11] INSTALLED FCB FLOOR TO SIDEWALL SUPPORT BS396-BS420 RBL23 PER SRM 51-40-02-0G-0;DWG 143A7500.; [12] VERIFIED STEP 11; [13] COMPLETED INSTALLATION FCB FLOOR TO SIDEWALL SUPPORT BS396-BS420 RBL23 PER SRM 51-40-02-0G-0;DWG 143A7500.; [14] VERIFIED STEP 13; [15] VERIFIED; STEP 13