What was found
CORROSION ON RAIL AT AFT CARGO BAY BS773 RBL3 WL157. ; / [01] PREVIOUSLY REPAIR NOT ALLOWABLE DAMAGE PER SRM; [02] VERIFIED; [03] VERIFIED PREVIOUSLY REPAIR NOT ALLOWABLE DAMAGE PER SRM; [04] REMOVED DAMAGED U-CHANNEL AT ACB BS773; RBL3 WL157 IAW SRM 51-00-53-2R-2; [05] REQUEST NDI TO CHECK FOR FREE CRACKS CONDITION ALONG THE CUT EDGES ON ACB RAIL BS 773 RBL 3 WL 157 JOGGLE AREA.; [06] HFEC INSPECTED TRIMMED EDGE OF DAMAGE CUTOUT PER 737NDT PART 6 51-00-00 PROCEDURE 23. NO CRACKS FOUND. CAL ID IS000450 S/N N500D000M120071; [07] VERIFIED APPLICABILITY FOR SRM 53-00-53-2R-2 REPAIR 2 FIG. 203 DETAIL F. ALTERNATIVE 5; [08] REMOVED DAMAGED AREA (UPPER FLANGE) FROM ACB RAIL BS773 RBL3; WL 157 IAW SRM 53-00-53-2R-2; REPAIR 2; PAR. 4.A-4.D. FIG. 202;; [09] STEP 8 STATEMENT INCORRECT: DAMAGED AREA WAS A PREVIOUS REPAIR; [10] REQUEST HFEC INSPECTION AT ALL REMOVED FASTENER LOCATIONS BS773 RBL3 WL157; [11] HFEC INSPECTED OPEN HOLES IAW 737 NDTM PART 6 51-00-00 PROCEDURE 16; NO CRACKS NOTED. EQUIP ID#: IS000450 S/N: N500D000M120071 EQUIP ID#: ATS2407 S/N: MM1591DD064104; [12] LOCATED AND DRILLED REINFORCING CHANNEL WITH BAC1510-1355 7050-T76511; LOT #1463855-1; IAW SRM 53-00-53-2R-2; FIG. 203; TABLE 205; RECEIVED MACHINED REINFORCING CHANNEL FROM OSS P.O. #830685-SWA; APPLIED CHEMICAL CONVERSION COATING IAW SOPM 20-43-03; OK TO PRIME.;