What was found
***CORROSION*** ON FORWARD CARGO BAY FLOOR TO SIDEWALL SUPPORT AT B.S. 500A-500D; R.B.L. 24; W.L. 154. / REMOVED R/H FCB SIDEWALL SUPPORT BS 500A - 500D. LOCATED DRILLED; COUNTER SUNK; APPLIED CHEMICAL CONVERSION COATING; PRIMER; INSTALLED NUT PLATES ON R/H SIDEWALL SUPPORT BS 500A - 500D IN FCB IAW MM 51-21-72; MM 51-21-41; SRM 51-40-05; SRM 51-40-08. INSTALLED R/H SIDEWALL SUPPORT BS 500A - 500D IAW SRM 51-40-02 DWG # 143A7505; DWG # 143A7500; DWG # 143A7501 7191U 03JUN20