Service difficulty report · Seat Track · Boeing 7377H4

Difficulty date
August 2, 2021
Submitted
August 18, 2021
Operation
Air carrier
Aircraft
N900WN
Make and model
Boeing 7377H4
Aircraft serial
32544
Aircraft time
46,019 hours, 27,554 cycles
Part
Seat Track
Condition
Corroded
Location
Bs 706-727a
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

A45-12 - PASSENGER CABIN SEAT TRACK UPPER CROWN AREA HAS LIGHT CORROSION; WL 207; RBL 47; STA 706 TO 727A. ; / [01] STARTED REMOVING CORROSION FROM SEAT TRACK AT STA 706 TO 727A. REMOVED . 045' FROM BOTTOM INSIDE CROWN OF SEAT TRACK. FOUND SEAT TRACK TO BE OUT OF LIMITS IAW SRM 53-00-52-1A-1STEP 4. A. (2) ; SRM 51-10-02-0G-0 STEP 15 A. AAR TOOL # 36307 CAL DUE. 06/14/22; [02] INSPECTION VERFIED; [03] REMOVED FLOOR PANELS 242CF AND 242DF FOR ACCESS IAW SRM 51-40-02-0G.; [04] CUT SEAT TRACK AT BS 709 AND REMOVED DAMAGED PORTION TO BS 727B AT FACTORY SPLICE IAW SRM 53-00-52-2R REPAIR 3.; [05] VERIFIED MATERIAL FOR -1 SEAT TRACK BAC1520-2779 7178-T6511; A-TAG A62188 IAW SRM 53-00-52-2R.; [06] VERIFIED ITEMS 4 AND 5; [07] EXTENDED CUTOUT IN UPPER CHORD OF FLOOR BEAM. LOCATED AND DRILLED TO SIZE NEW SECTION OF SEAT TRACK FROM BS 709 TO 727B; COUNTERSUNK AS REQUIRED IAW SRM 53-00-52-2R REPAIR 3.; [08] VERIFIED ITEM 7. OK TO TREAT AND PRIME CUT AND REWORKED AREAS; [09] APPLIED ALODINE AND PRIMED SEAT TRACK AND REWORKED AREAS IAW SRM 53-00-52-2R REPAIR 3.; [10] VERIFIED ITEM 9.<BR>VERIFIED REPAIR SECTION ORDERED IS ANODIZED FROM VEND [11] INSTALLED REPAIR PARTS IAW SRM 53-00-52-2R-3 [15] INSTALLED FLOOR PANELS # 242 CF AND 242 DF; IAW AMM 53-51-00-400-801; STEP 3.

More about the Boeing 737-7H4