Service difficulty report · Cargo Track · Boeing 7377H4

Difficulty date
July 14, 2021
Submitted
August 18, 2021
Operation
Air carrier
Aircraft
N444WN
Make and model
Boeing 7377H4
Aircraft serial
29839
Aircraft time
61,121 hours, 35,983 cycles
Part
Cargo Track
Condition
Corroded
Location
Bs 727d
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON TRACK AT AFT CARGO BAY BS727D+6 RBL3 WL156. ; / [01] CORROSION ON RAIL AT AFT CARGO BAY BS727D+6 RBL3 WL156 IS OUT OF LIMITS DUE TO FASTENER HOLE PROXIMITY TO CORROSION PER SRM 53-00-53-1A-2 FIG. 103 DETAIL D; [02] INSPECTED AND VERIFIED CORROSION ON RAIL AT AFT CARGO BAY BS727D+6 RBL3 WL156 IS OUT OF LIMITS DUE TO FASTENER HOLE PROXIMITY TO CORROSION PER SRM 53-00-53-1A-2 FIG. 103 DETAIL D; [03] VERIFIED APPLICABILITY FOR REPAIR AT RAIL AT AFT CARGO BS 727D+6 RBL3 WL156 IAW SRM 53-00-53-2R-2.[06] PERFORMED CUT OF THE UPPER FLANGE AT RAIL AT AFT CARGO BS727D+6 RBL3 WL156 IAW SRM 53-00-53-2R-2 REPAIR 2;STEP 4D (1A-B).; [10] LOCATED; DRILLED AND TRIMMED NEW REPAIR CHANNEL FOR ACB RAIL AT BS 727D+6 RBL 3 WL 156 APPLIED CHEMICAL CONVERSION COAT TO ALL BARE METAL AREAS IN REPAIR AND PRIMED. INSTALLED NUT PLATES ALL IAW SRM 53-00-53-2R-2 STEPS 4 J K L M N O AND P OK TO INSTALL; [11] ADDITION TO STEP 10 NEW -6 REINFORCING CHANNEL P/N 53100004-001 FROM BAC1510-1355 7050-T76511 LOT # 1461073-1; [12] VERIFIED CORRECTIVE ACTION ITEMS 10 AND 11. OK TO INSTALL.; [13] INSTALLED NEW -6 REINFORCING CHANNEL AT REPAIR AREA BS 727D+6 RBL 3 WL 156 IAW SRM 53-00-53-2R-2 STEP 4 Q;