Service difficulty report · Support · Boeing 7377H4

Difficulty date
August 4, 2021
Submitted
August 23, 2021
Operation
Air carrier
Aircraft
N964WN
Make and model
Boeing 7377H4
Aircraft serial
36965
Aircraft time
32,901 hours, 20,020 cycles
Part
Support
Condition
Corroded
Location
Bs 727c
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON FLOOR TO SIDEWALL SUPPORT AT AFT CARGO BAY BS727C+6.5 LBL22 WL156. ; / [01] REMOVED CORROSION 1'X1'X0.005' AT ACB BS 727C+6.5 LBL22. DAMAGE EXCEED 10% OF ORIGINAL MATERIAL THICKNESS. FOUND TO BE OUT OF LIMIT IAW SRM 53-00-53-1A-2; [02] VERIFIED REMOVED CORROSION 1'X1'X0.005' AT ACB BS 727C+6.5 LBL22. DAMAGE EXCEED 10% OF ORIGINAL MATERIAL THICKNESS. FOUND TO BE OUT OF LIMIT IAW SRM 53-00-53-1A-2; [03] CALIBRATED TOOL<BR>DIAL DEPTH GAUGE ID:ATS1225<BR>S/N: UNKNOWN; [04] REMOVED ACB FLOOR TO SIDEWALL SUPPORT BS727-847 LBL22 IAW SRM 51-40-02-0G-0; [05] LOCATED; DRILLED; AND COUNTERSANK NEW FLOOR TO SIDEWALL SUPPORT MAT'L BAC1496-377#7075T62 .040 LOT#1462654-1 IAW SRM 51-40-05-0G-0; SRM 51-40-08-0G-0; AND DWG 146A7502 REV:-; [06] LOCATED AND DRILLED NEW SPLICE AT BS747+10' ON NEW FLOOR TO SIDEWALL SUPPORT LBL22 IAW SRM 53-00-53-2R-6; [07] APPLIED CHEMICAL CONVERSION COATING AND PRIMER ON NEW FLOOR TO SIDEWALL SUPPORT AND NEW SPLICE IAW SRM 51-20-01-0G-0 AND SOPM 20-41-02; [08] OK TO INSTALL NEW SPLICE ON NEW FLOOR TO SIDEWALL SUPPORT; [09] VERIFIED CHEMICAL CONVERSION COATING AND PRIMER PER SRM AND SOPM AND VERIFIED OK TO INSTALL.; [10] INSTALLED NEW SPLICE AT BS747+10' ON NEW FLOOR TO SIDEWALL SUPPORT LBL22 IAW SRM 53-00-53-2R-6; [11] INSTALLED NUTPLATES ON NEW FLOOR TO SIDEWALL SUPPORT LBL22 IAW IAW SRM 51-40-10-2R-0 AND DWG 146A7500 REV:

More about the Boeing 737-7H4