Service difficulty report · Fitting · Boeing 7377CT

Difficulty date
July 13, 2021
Submitted
September 2, 2021
Operation
Air carrier
Aircraft
N7821L
Make and model
Boeing 7377CT
Aircraft serial
32748
Aircraft time
58,592 hours, 29,340 cycles
System (JASC)
5711 · Wing Spar
Part
Fitting
Condition
Cracked
Location
Rt Wing Spar
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

R/W REAR SPAR FIXED T/E DEFLECTION CONTROL RIB PANEL VERTICAL BULB SEAL FITTING CRACKED I/B SIDE MKD DOT ; / [01] REMOVED R/W REAR SPAR FIXED T/E DEFLECTION CONTOL RIB PANEL VERTICAL BULB SEAL FITTING THAT WAS CRACKED REF: SRM 51-40-02; [02] REMOVED AND REPLACED R/W REAR SPAR FIXED T/E DEFLECTION CONTOL RIB PANEL VERTICAL BULB SEAL FITTING THAT WAS CRACKED REF: SRM 51-40-02; [03] VERIFIED STEPS 1 AND 2

More about the Boeing 737-7CT