Service difficulty report · Support · Boeing 73773V

Difficulty date
August 1, 2021
Submitted
September 3, 2021
Operation
Air carrier
Aircraft
N7839A
Make and model
Boeing 73773V
Aircraft serial
30243
Aircraft time
57,802 hours, 35,522 cycles
Part
Support
Condition
Corroded
Location
Fwd Cargo
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON FCB FWD R/H FLOOR-TO-SIDEWALL SUPPORT; BS 400+2; RBL 24; WL 156 (MARKED) ; / REMOVED CORRISION FROM FCB FWD R/H FLOOR-TO-SIDEWALL SUPPORT; BS 400+2; RBL 24; WL 156. P/N 143A7501-2; IN AREA 0.3' X 0.4' X 0.019' DEEP; ORIGINAL THICKNESS 0.04' FOUND TO BE OUT OF LIMITS IAW SRM 53-00-53-1A-2 PER 4.A(2) FIG. 103 DETAIL A <BR>TOOL USED <BR>-DEPTH GAGE <BR>ID:ATS2472. S/N: UNKNOWN. DUE DATE: 06/2022; [03] VERIFIED REMOVED CORRISION FROM FCB FWD R/H FLOOR-TO-SIDEWALL SUPPORT; BS 400+2; RBL 24; WL 156. P/N 143A7501-2; IN AREA 0.3' X 0.4' X 0.019' DEEP; ORIGINAL THICKNESS 0.04' FOUND TO BE OUT OF LIMITS IAW SRM 53-00-53-1A-2 PER 4.A(2) FIG. 103 DETAIL A.; [04] FABRICATED NEW FCB FWD R/H FLOOR TO SIDEWALL SUPPORT; BS 400+2; RBL 24; WL 156 USING BAC1496-444 7075 T62 EXTRUSION LOT NO: 1457271-1 PER BOEING DRAWING 143A7501.; [05] LOCATED AND DRILLED NEW FCB FWD R/H FLOOR TO SIDEWALL SUPPORT; BS 400+2; RBL 24; WL 156 PER BOEING DRAWING 143A7500 AND SRM 51-40-05-0G-0.; [06] OK TO APPLY CHEMICAL CONVERSION COAT AND PRIMERREQUIRE OK TO INSTALL; [11] VERIFIED OK TO INSTALL; [12] INSTALLED NEW FCB FWD R/H FLOOR TO SIDEWALL SUPPORT; BS396- 420; RBL 24; WL 156 IAW SRM 51-40-02 AND BOEING DRAWING 143A7500

More about the Boeing 737-73V