What was found
CRACKED FLOOR SUPPORT AT B.S 540; B.L. 0 - L.B.L. 24.5; W.L. 208.1. ; / [01] REMOVED FLOOR SUPPORT AT BS540 LBL24.5 PER SRM 51-40-02-0G-0; [02] LOCATED AND DRILLED NEW FLOOR SUPPORT AT BS 540;BL0-LBL24.5 PER SRM 51-40-05-0G-0 ; OK TO INSTALL; [03] VERIFIED CORRECTIVE ACTION #2. OK TO INSTALL GIVEN.; [04] INSTALLED FLOOR SUPPORT AT BS 540 BL0-LBL24.5 WL 208 PER SRM 51-40-02-0G-0 AND DWG#143A0060; [05] VERIFIED CORRECTIVE ACTION 4.<BR><BR>FLOOR SUPPORT REPLACED.; [06] FLOOR SUPPORT AT BS540; BL0 - LBL24.5; WL208.1 REPLACED. ALL WORK ACCOMPLISHED