What was found
CORROSION ON FRAME SPLICE AT AFT CARGO BAY BS787 RBL25 WL158. ; / [01] EVALUATED CORROSION; FOUND TO BE OUT OF LIMITS DUE TO NO LIMITS IN THE SRM AND REQUIRES REPLACEMENT PER SRM 51-10-02-0G-0; [02] VERIFIED CORRECTIVE ACTION ENTRY 1.; [03] REMOVED FRAME SPLICE CAP; BS 787; RBL25; WL 158 PER SRM 51-40-02-0G-0.; [04] LOCATED ; DRILLED ; DEBURRED NEW FRAME SPLICE CAP BS 787 RBL25 WL 158 PER SRM 51-40-05-0G-0; BOEING DWG 146A1262.; [05] VERIFIED CORRECTIVE ACTION #4.; [06] OK TO INSTALL FRAME SPLICE CAP; BS 787 RBL 25; WL 158.; [07] VERIFIED OK TO INSTALL FRAME SPLICE CAP; BS 787 RBL 25; WL 158.; [08] INSTALLED FRAME SPLICE CAP BS 787 RBL25 ; WL 158 PER SRM 51-40-02-0G-0; & DWG 146A1262.; [09] VERIFIED INSTALLED FRAME SPLICE CAP BS 787 RBL25 ; WL 158 PER SRM 51-40-02-0G-0; & DWG 146A1262.