What was found
AFT CARGO- L/H TRANSITION ANGLE HAS CORROSION AROUND FASTENER HOLES FROM STA 727A TO 747 ; / [01] REMOVED CORROSION; FOUND SEVERAL AREAS OF MATERIAL LOSS TO BE OUT OF LIMITS; [02] REMOVED TRANSITION ANGLE; [03] FABRICATED NEW TRANSITION ANGLE PER SRM 53-00-51; [04] VERIFIED FABRICATION; [05] ALODINE NEW TRANSITION ANGLE IAW AMM 51-21-41 AND APPLIED<BR>BMS10-79 PRIMER IAW AMM 51-21-72.; [06] VERIFIED ALODINE AND PRIME.; [07] INSTALLED BONDING NUTPLATES PER SRM 51-40-10 TO NEW FABRICATED PART .NUTPLATES INSLALLED AT 0200 8/25/2021; [08] VERIFIED INSTALLED BONDING NUTPLATES PER SRM 51-40-10 TO NEW FABRICATED PART .NUTPLATES INSLALLED AT 0200 8/25/2021; [09] REMOVED AND REPLACED TRANSITION ANGLE PER SRM 51-40-02. NEW ANGLE INSTALLATION ON ROUTINE CARD 5360-E-16462-NG (FLOOR STRUCTURE CORROSION PROTECTION) TG8Q004DKZM. ANGLE PN 146A7502-29.<BR>CHECK INDIVIDUAL SIGN OFFS.