Service difficulty report · Stringer · Boeing 7377H4

Difficulty date
July 30, 2021
Submitted
September 15, 2021
Operation
Air carrier
Aircraft
N491WN
Make and model
Boeing 7377H4
Aircraft serial
33867
Aircraft time
53,758 hours, 31,898 cycles
Part
Stringer
Condition
Cracked
Location
Bs 540 S26l
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CRACKED STRINGER AT AREA AFT OF FCB BS540 S-26L WL153. MARKED ; / [01] EVALUATED CRACK ON STR 26L LBL17 BS540 FOUND TO BE OUT OF LIMITS PER SRM-00-03-1A-1 FIG103/ ALLOWABLE DAMAGE 1 DETAIL A AND UPDATED MEASUREMENT TABLE; [02] CUT OUT DAMAGED STRINGER SECTION BS. 500D +13' - BS 540; STR 26L PER SRM 53-00-03-2R-1.; [03] REQUEST NDI; HFEC CUT EDGES FOR CRACK FREE CONDITION.; [04] HFEC INSPECTED TRIMMED EDGE OF DAMAGE CUTOUT PER 737NDT PART 6 51-00-00 PROCEDURE 23. NO CRACKS FOUND. CAL ID IS000450 S/N N500D000M120071; [05] RECEIVED REPAIR PARTS FROM OSS STRINGER SECTION AND HAT SECTION ON SWA PO #832526 AND PO #832527 DATED 05 AUG 21; [06] VERIFIED RECEIVED PARTS IN CORRECTIVE ACTION # 5.; [07] LOCATED DRILLED AND TRIMMED NEW STRINGER REPAIR SECTION AND NEW STRINGER HAT SECTION APPLIED CHEMICAL CONVERSION COAT TO REPAIR PARTS AND REPAIR AREA BS 500D+10 TO 540 STRINGER 26L WL 153 AIW SRM 53-00-03-2R-1 STEPS 4 E F G H AND I OK TO PRIME; [08] VERIFIED CORRECTIVE ACTION #7.<BR>OK TO PRIME GIVEN.; [09] PRIMED STRINGER REPAIR PARTS AND REPAIR AREA AT BS 500D+10 TO 540 STR 26 L/H WL 153 IAW SRM 53-00-03-2R-1 STEP 4 J OK TO INSTALL; [10] VERIFIED CORRECTIVE ACTION ITEM 9; OK TO INSTALL REPAIR PARTS; [11] INSTALLED REPAIR PARTS AT BS500D+10 TO 540 STR 26 L/H WL 153 SEALED AND APPLIED CIC ALL IAW SRM 53-00-03-2R-1 STEPS 4 K AND L; [12] VERIFIED REPAIR COMPLETE; [13] VERIFIED REPAIR INSTALLED AND COMPLETE IAW SRM 53-00-03-2R-1

More about the Boeing 737-7H4