What was found
**CORROSION** FWD CARGO COMPARTMENT BILGE AREA L/H SIDE ZEE CHANNEL; BETWEEN STA # 458 AND STA # 500D; WITH SPOTS OF CORROSION. DOT # 208-101 ; / [07] RECEIVED NEW PIECES AND FABRICATED NEW SIDE PLATE REPAIR PART (SPLICE) PER B 737-700 SRM 53-00-53-2R-5 REPAIR 5; [08] LOCATED AND DRILLED REPAIR PART ON AREAS AS PER REF B 737-700 SRM 53-00-53-2R-5 REPAIR 5 AND SRM 51-40-05-0G-0; [09] (LATE ENTRY) OK TO LOCATE AND DRILL.; [10] VERIFIED STEP #8; LOCATED AND DRILLED.; [11] OK TO TREAT AND PRIME.; [12] TREATED AND PRIMED FWD CARGO BILGE L/H SIDE ZEE CHANNEL AS PER B737-700 SRM 51-20-01-0G-0; [13] VERIFIED STEP #12; [14] OK TO INSTALL DOUBLER (SPLICE).; [15] INSTALLED DOUBLER (SPLICE) AT FWD CARGO L/H PER B737-700 SRM 51-40-02-0G-0 ; SRM 53-00-53-2R-5; [16] VERIFIED STEP #15; DOUBLER INSTALLED.; [17] OK TO INSTALL NEW 'Z' CHANNEL FROM STA 458 TO STA 500D. FWD CARGO COMPARTMENT.; [18] INSTALLED NEW Z CHANNEL FROM STA 400 TO 500D AT L/H FWD CARGO AS PER B737-700 SRM 51-40-72-0G-0; [19] VERIFIED STEP #18; [20] REMOVED CORROSION AT FWD CARGO COMPARTMENT BILGE AREA L/H SIDE ZEE CHANNEL; BETWEEN STA # 458 AND STA # 500D IAW SRM 51-10-02-0G-0 AND SRM 53-00-53-1A-2 FOUND OUT OF LIMITS RECEIVED NEW PIECES FABRICATED SPLICES PER B 737-700 SRM 53-00-53-2R-5 REPAIR 5 AND INSTALLED NEW Z CHANNEL ON AREA; [21] VERIFIED STEP 20