What was found
**CORROSION** FWD CARGO COMPARTMENT BILGE AREA R/H SIDE ZEE CHANNEL; BETWEEN STA # 500A AND STA # 500D; WITH SPOTS OF CORROSION. DOT # 208-103 ; / [01] REMOVED CORROSION AT FWD CARGO COMPARTMENT BILGE AREA R/H SIDE ZEE CHANNEL; BETWEEN STA # 500A AND STA # 500D IAW SRM 53-00-53-1A-2; [02] VERIFIED 1.; [03] PERFORMED UT THICKNESS INSP ON REWORKED AREA IAW B737 NDT P4 51-00-00 PROC.3 ; MIN THICKNESS NOTED 0.033'<BR>TOOL USED : MX3 B/C 17049 CAL DUE : 15 JUN 22; [04] EVALUATED DAMAGE; ORIGINAL MAT .040' MAT REMAINING .033' MAT REMOVED .007' MAT ALLOWED TO BE REMOVED .004' FOUND OUT OF LIMITS PER SRM 53-00-53-1A-2 FIG 103 DETAIL D; [05] VERIFIED 1 AND 4; [06] FABRICATED FWD CARGO COMP BILGE AREA R/H SIDE ZEE CHANNEL AT STA 500A TO STA 500D IAW B737 DWG 143A7501-16. MATERIAL USED BAC1496-444 7075-T62 PO#1715975; [07] VERIFIED STEP #6; PART FABRICATED.; [08] OK TO TREAT AND PRIME.; [09] TREATED AND PRIMED IAW SRM 51-21-01-0G-0; [10] VERIFIED 9.; [11] ZEE CHANNEL WILL BE INSTALLED ON ITEM TTG8Q004F0XJ; [12] VERIFIED 11.