Service difficulty report · Support · Boeing 737*

Difficulty date
August 18, 2021
Submitted
September 27, 2021
Operation
Air carrier
Aircraft
N208WN
Make and model
Boeing 737*
Aircraft serial
29856
Aircraft time
52,294 hours, 30,932 cycles
Part
Support
Condition
Corroded
Location
Fuselage
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION AFT CARGO BAY TO SIDEWALL SUPPORT BS 767 TO BS 722B RBL 22 WL 156 ; / [01] REMOVED CORROSION AFT CARGO BAY TO SIDE WALL; SUPPORT BS 767 TO BS 722 RBL; 22 WL 156 MEASURES: L= 1' W= 1.400' W= 0.020' THIKNES REMANENT 0.020' TOOL USED ID: 1225 S/N: UNKNOW DUE: 07/22 OUT OF LIMITS; [02] CORRECTED P/N IN MEASUREMENTS SECTION; ADDING REFERENCE FOR DAMAGE REMOVAL AND ALLOWABLE DAMAGE FOR CORRECTIVE ACTION ITEM 1: SRM 53-00-53-1A-2 AND SRM 51-10-02; [03] CORRECTING BS LOCATION FOR CORRECTIVE ACTION ITEM 1: REMOVED CORROSION BS 767-727B; [04] VERIFIED CORRECTIVE ACTION STEPS1-3 PER SRM.; [05] LOCATED AND DRILLED NEW EXTRUSION BAC1496-377 LOT 1467164-1 FROM BS767 - BS727 IAW SRM 51-40-05 AND DWG 146A7502; OK TO PROTECTIVE TREATMENT; [06] VERIFIED CORRECTIVE ACTION 5 OK TO APPLY CHEMICAL CONVERSION COATING AND PRIMER; [07] REMOVED SIDEWALL SUPPORT BS 767 TO BS 727 B RBL 22 WL 156 PER SRM 51-40-02; [08] OK TO INSTALL; [09] OKAY TO INSTALL REPAIR PARTS.; [10] INSTALLED NEW ACB FLOOR TO SIDEWALL SUPPORT BS 727 TO BS 767 RBL 22 WL 156 IAW SRM 51-40-02 AND DWG # 146A7500; [11] VERIFIED CORRECTIVE ACTION 10.; [12] VERIFIED ALL WORK STEPS COMPLETE THIS TASK