Service difficulty report · Floor Support · Boeing 737*

Difficulty date
August 19, 2021
Submitted
September 27, 2021
Operation
Air carrier
Aircraft
N208WN
Make and model
Boeing 737*
Aircraft serial
29856
Aircraft time
52,294 hours, 30,932 cycles
Part
Floor Support
Condition
Corroded
Location
Fuselage
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON AFT BULKHEAD TO FLOOR SUPPORT AT FWD CARGO BAY BS500D RBL6 TO RBL20 WL156. ; / [01] REMOVED CORROSION FROM FCB AFT BULKHEAD TO FLOOR SUPPORT ANGLE P/N (143A9485-35) BS 500D RBL6 TO RBL 24 IN AREA OF 18' X 1' ORIGINAL MATERIAL THICKNESS 0.071' REMAINING MATERIAL THICKNESS 0.048' FOUND TO BE OUT OF LIMIT IAW SRM 53-30-08-1A-1 PAR 4A2 FIG. 103<BR>MATERIAL USED MICROMETER ID:ATS1672; SN:65092939; [02] VERIFIED REMOVED CORROSION FROM FCB AFT BULKHEAD TO FLOOR SUPPORT ANGLE P/N (143A9485-35) BS 500D RBL6 TO RBL 20 IN AREA OF 18' X 1' ORIGINAL MATERIAL THICKNESS 0.071' REMAINING MATERIAL THICKNESS 0.048' FOUND TO BE OUT OF LIMIT IAW SRM 53-30-08-1A-1 PAR 4A2 FIG. 103.; [03] REMOVED BULKHEAD CENTER TO FLOOR SUPPORT ANGLE P/N (143A9485-35) SRM 51-40-02.-; [04] RECEIVED NEW AFT BULKHEAD TO FLOOR SUPPORT AT FWD CARGO BAY BS500D; RBL6 TO RBL20; WL156<BR><BR>OK TO INSTALL; [05] OKAY TO INSTALL NEW AFT BULKHEAD TO FLOOR SUPPORT AT FWD CARGO BAY BS500D; RBL6 TO RBL20; WL156; [06] INSTALLED NEW AFT BULKHEAD TO FLOOR SUPPORT AT FWD CARGO BAY BS500D RBL6 TO RBL 20; WL 156 PER SRM 51-40-02-0G-0 AND BOEING DWG 143A9481; [07] CORRECTED MEASUREMENTS SECTION; [08] INSTALLED NEW AFT BULKHEAD TO FLOOR SUPPORT AT FWD CARGO BAY BS500D RBL6 TO RBL 20; WL 156 PER SRM 51-40-02-0G-0 AND BOEING DWG 143A9481 AND BOEING DWG 143A7902;[10] VERIFIED INSTALLATION OF NEW FCB AFT BLKHD-TO-FLOOR SUPPORT; BS 500D; RBL 6 - RBL 20; WL 156 PER SRM 51-40-02 AND DWG'S 143A9481 AND 143A7902;