What was found
FWD CARGO L/H SIDE STA 500D S-19L GUSSET BRACKET CRACK. ; / [01] REMOVED CRACKED GUSSET AS PER B737-700 SRM 51-40-02-0G-0.; [02] LOCATED AND DRILLED NEW GUSSET AS PER B737-700 SRM 51-40-05-0G-0.; [03] VERIFIED DRILLING.<BR>OK TO TREAT AND PRIME HOLES.; [04] APPLIED ALODINE AND PRIMER TO HOLES AS PER B737-700 SRM 51-20-01-0G-0.; [05] VERIFIED ALODINE AND PRIMER APPLICATION.; [06] OK TO INSTALL NEW GUSSET.; [07] PARTIALLY INSTALLED GUSSET AS PER B737-700 SRM 51-40-02-0G-0. 80 HR. SEALANT MIX TIME: 13:15; 8/31/21.; [08] COMPLETED INSTALLATION OF GUSSET AS PER B737-700 SRM 51-40-02-0G-0.; [09] REPLACED GUSSET AT FWD CARGO L/H SIDE STA 500D S-19L AS PER B737-700 SRM 51-40-02-0G-0.; [10] COMPLETION TIME: 7:45; 9/1/21.; [11] VERIFIED GUSSET INSTALLATION STEPS