Service difficulty report · Support · Boeing 737

Difficulty date
October 5, 2021
Submitted
April 29, 2022
Operation
Air carrier
Aircraft
N788SA
Make and model
Boeing 737
Aircraft serial
30603
Aircraft time
68,361 hours, 40,407 cycles
Part
Support
Condition
Corroded
Location
Fwd Cargo Bay
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

SUPPLEMENTAL INFORMATION: FWD CARGO BAY; FLOOR TO SIDE WALL SUPPORT CORRODED; BS500+4; 10; 14; 18;19;22; 30; 34; 42; 46; LBL24; WL156 / REMOVED CORROSION ON FLOOR TO SIDEWALL SUPP0RT AT DISCREPANCY AREA .FOUND TO BE OUT OF LIMITS AT BS 500 +4 L=1.6' W=0.6' D=0.14' ORIGINAL THICKNEES 0.040' REMAINING MAT=0.026' PER IAW 53-00-53-1A-2 FIG 103 CORECTION :USED TOOL ID ATS1672 DATE DUE 03/2022 VERIFIED CORRECTIVE ACTION 1 AND 2. CORRECTION:INFORMATION MEASUREMENTS VERIFIED CORRECTIVE ACTION 4 FABRICATED FLOOR TO SIDEWALL SUPPOR ZEE FROM BAC1496-444 7075T62 LOT#1467644-1 FROM BS400 TO 500D LBL24 IAW SRM 53-00-53-2R-6 REPAIR 6. OK TO TREAT AND PRIME REPAIR PARTS VERIFIED FABRICATED FLOOR TO SIDEWALL SUPPOR ZEE FROM BAC1496-444 7075T62 LOT#1467644-1 FROM BS400 TO 500D LBL24 IAW SRM 53-00-53-2R-6 REPAIR 6. FABRICATED (1EA) SPLICE SIDEPLATE FROM BAC1496-444 7075T62 LOT#1467644-1 LOCATED AT BS480+10LBL24WL.156 IAW SRM 53-00-53-2R-6 REPAIR 6 TABLE 201 [2]. VERIFIED CORRECTIVE ACTION STEP 8. APPLIED CHEMICAL CONVERSION COATING AND PRIMER ON ALL REPAIR PARTS IAW SRM 53-00-53-2R-6PARAG.4.I.J. & SRM 51-20-01-0G-0 AND SOPM 20-41-02. OK TO INSTALL. VERIFIED CORRECTIVE ACTION STEP 10. VERIFIED OK TO INSTALL. INSTALLED AT FWD. CARGO BAY FLOOR TO SIDEWALL SUPPORT LOCATED BTW BS 400 - BS. 500D LBL 24 WL 156. IAW SRM 51-40-02 DWG# 143A7500 AND DWG#143A7505. VERIFIED CORRECTIVE ACTIONS 12