What was found
CORROSION ON FORWARD CARGO BAY AFT BULKHEAD RIGHT HAND PANEL LOWER SUPPORT AT B.S. 500D; R.B.L. 24; W.L. 154. ; / [01] REMOVED CORROSION ON AFT BULKHEAD LOWER SUPPORT AT BS500D; RBL24; WL154; REWORKED AREA: L=1.5'; W=1'; D=0.010; WAS FOUND WITHIN LIMIT; REMAINING THICKNESS= 0.061' IAW SRM 53-30-08-1A-1<BR><BR>TOOL USED; MICROMETER:<BR>ID: ATS1671<BR>S/N: 65093024<BR>DUE: 01/2022; [02] VERIFIED DAMAGE REMOVED FROM AFT BULKHEAD LOWER SUPPORT AT BS500D; RBL24; WL154. REWORKED AREA: L=1.5'; W=1'; D=0.010'; WAS FOUND WITHIN LIMIT; REMAINING THICKNESS= 0.061' IAW SRM 53-30-08-1A-1. OKAY TO TREAT AND PRIME.; [03] APPLIED CHEMICAL CONVERSION COATING AND TWO LAYERS OF PRIMER TO REWORKED AREA IAW SRM 51-20-01 AND SOPM 20-41-02; [04] VERIFIED CHEMICAL CONVERSION COATING AND TWO LAYERS OF PRIMER TO APPLIED TO REWORKED AREA IAW SRM 51-20-01 AND SOPM 20-41-02.; [05] OK TO INSTALL ON FORWARD CARGO BAY AFT BULKHEAD SUPPORT RIGHT SIDE AT BS500D; [06] OKAY TO INSTALL FWD CARGO BAY AFT RIGHT SIDE BULKHEAD SUPPORT AT BS 500D.; [07] INSTALLED AFT RIGHT SIDE BULKHEAD SUPPORT AT BS 500D IAW SRM 51-40-02 AND; DWG #143A7902; [08] VERIFIED INSTALLATION OF AFT RH BULKHEAD PANEL LOWER SUPPORT AT BS 500D; RBL 24; WL 154; PER SRM 51-40-02 AND DWG# 143A7902; [09] VERIFIED ALL WORK COMPLETE THIS TASK