What was found
AFTER PERFORMED DVI OF R-1 DOOR UPPER FWD CUTOUT FOUND CRACKED INTERNAL STUB FRAME STA 296. ; / [01] REMOVED DAMAGE STUB FRAME AT R-1 DOOR UPPER FWD. CUTOUT STA. 296; AS PER B737-7 SRM 51-40-02-0G-0.; [02] LOCATED & DRILLED NEW STUB FRAME R-1 DOOR FWD UPPER CUTOUT STA 296; AS PER B737-7 SRM 51-40-05-0G-0 & DWG. # 141A8370.; [03] VERIFIED STEPS 1 AND 2; [04] OK TO INSTALL NEW STUB FRAME; [05] MIXED BMS 5-95 SEALANT AT 09.00 AM 11-4-21 SQUEEZE OUT TIME BY 05.00 PM 11-7-21; [06] INSTALLED NEW STUB FRAME AT R-1 DOOR FWD UPPER CUTOUT STA 296; AS PER B737-7 SRM 51-40-02-0G-0 & DWG. # 141A8370.