What was found
CORROSION ON ATTACH ANGLE AT AFT CARGO BAY BS727D+5 RBL7 WL151. ; / [01] EVALUATED DAMAGE IN ATTACH ANGLE ACB AT BS 727D+5 RBL7 WL151 FOUND TO BE OUT LIMIT DUE NOT LIMITS IN SRM; PART WILL BE REPARAIBLE BY REPLACEMENT IAW SRM 51-10-02-0G-0; [02] REMOVED ATTACH ANGLE ACB AT BS 727D+5 RBL7 WL151 IAW SRM 51-40-02-0G-0; [03] VERIFIED CORRECTIVE ACTION STEPS 1 AND 2.; [04] FABRICATED AND DRILLED NEW ANGLE FROM EXTRUSION BAC1493-672#7075-T62 LOT#1458580-1 TO BS 727D+5 RBL 7 WL; 151 IAW SRM 51-40-05-0G-0 AND DWG 146A7730 .OK TO PRIME .; [05] VERIFIED FABRICATED AND DRILLED NEW ANGLE FROM EXTRUSION BAC1493-672#7075-T62 LOT#1458580-1 TO BS 727D+5 RBL 7 WL 151 IAW SRM 51-40-05-0G-0 AND DWG 146A7730.<BR>VERIFIED OK TO TREAT AND PRIME.; [06] APPLIED ONE LAYER OF BMS 10-11; TYPE I PRIMER ON ANGLE TO BS 727D+5 RBL 7 WL; 151 IAW SOPM SOPM 20-41-02.; [07] VERIFIED TREATED AND APPLIED ONE LAYER OF BMS 10-11; TYPE I PRIMER ON ANGLE TO BS 727D+5 RBL 7 WL 151 IAW SOPM 20-41-02.; [08] OK TO INSTALL ANGLE; [09] OK TO INSTALL.; [10] INSTALLED NEW ATTACH ANGLE AT ACB BS727D+5 RBL7 WL151 IAW SRM 51-40-02-0G-0 AND DRAWING#146A7730.<BR>TASK COMPLETE; [11] CORRECTED REPAIR TYPE (N/A); [12] VERIFIED CORRECTIVE ACTION ITEM 10.; [13] VERIFIED TASK IS COMPLETE.