Service difficulty report · Support · Boeing 737*

Difficulty date
October 8, 2021
Submitted
November 15, 2021
Operation
Air carrier
Aircraft
N788SA
Make and model
Boeing 737*
Aircraft serial
30603
Aircraft time
68,361 hours, 40,407 cycles
Part
Support
Condition
Corroded
Location
Fuselage
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON FCB RH FLOOR TO SIDEWALL SUPPORT BS 400-420 RBL 21 WL 156 ; / [01] REMOVED CORROSION FLOOR TO SIDEWALL SUPPORT FWD CARGO BAY AT DISCREPANCY AREA BS400-420 RBL21 WL156; IN AREA L=3''; W=2''; D=0.012''; ORIGINAL THICKNESS 0.040''; REMAINING THICKNESS 0.030'' FOUND TO BE OUT OF LIMITS IAW SRM 53-00-53-1A-2; TOOL USED: DEPTH GAGE ID:ATS1672; DUE DATE: 03/2022; [02] CORRECTION=REMOVED CORROSION FLOOR TO SIDEWALL SUPPORT FWD CARGO BAY AT DISCREPANCY AREA BS400-420 RBL21 WL156; IN AREA L=3''; W=2''; D=0.012''; ORIGINAL THICKNESS 0.040''; REMAINING THICKNESS 0.028'' FOUND TO BE OUT OF LIMITS IAW SRM 53-00-53-1A-2; TOOL USED: DEPTH GAGE ID:ATS1672; DUE DATE: 03/2022; [03] VERIFIED CORRECTIVE ACTION 1 AND 2; [04] FABRICATED LOCATED AND DRILLED NEW FLOOR TO SIDEWALL SUPPORT FCB FROM BS400 TO BS420 RBL21 WL156; MAT. ITEM #BAC1496-444#7075T6; LOT#5098100-1 IAW SRM 51-40-05-0G-0; DWG#143A7500;OK TO TREAT.; [05] VERIFIED CORRECTIVE ACTION STEP 4.; [06] APPLIED CHEMICAL CONVERCION COATING AND PRIMER IAW SRM 51-20-01-OG-0 AND SOPM 20-41-02 AT FLOOR TO SIDEWALL SUPPORT; [07] VERIFIED CORRECTIVE ACTION STEP 6.; [08] OK TO INSTALL .; [09] VERIFIED CORRECTIVE ACTION 8; OK TO INSTALL GIVEN.; [10] INSTALLED ON FCB RH FLOOR TO SIDEWALL SUPPORT BTW BS400 -420 RBL 21 WL 156 IAW SRM 51-40-02; DWG# 143A7500; [11] RII INSPECTED ACTION 10; [12] INSPECTION COMPLETE