Service difficulty report · Support · Boeing 737*

Difficulty date
October 8, 2021
Submitted
November 15, 2021
Operation
Air carrier
Aircraft
N788SA
Make and model
Boeing 737*
Aircraft serial
30603
Aircraft time
68,361 hours, 40,407 cycles
Part
Support
Part number
141A95025
Condition
Cracked
Location
Flight Deck
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

FLIGHT DECK P18 CIRCUIT BREAKER PANEL ATTACH GUSSET CRACKED BS261 S-8L WL265. MARKED ; / [01] REMOVED SUPPORT CLIP WITH P/N 141A9502-5; LOCATED BTW BS. 261; STR8L; WL 265; IAW SRM 51-40-02; [02] REMOVED SUPPORT CLIP WITH P/N 141A9502-5; LOCATED BTW BS. 261; STR8L; WL 265; IAW SRM 51-40-02; NO ALLOWABLE DAMAGE ENTRIES IN SRM PART WILL BE REPAIR BY REPLACEMENT IAW SRM 51-10-02 PARAG.9.C; [03] VERIFIED CORRECTIVE ACTION STEP 2.; [04] FORMED NEW SUPPORT CLIP 6013T4#0.050'' LOT#1451927-1 IAW DRAWING#141A9502; HEAT TREATMENT REQUIRED TO T6; [05] VERIFIED FORMED NEW SUPPORT CLIP 6013T4#0.050'' LOT#1451927-1 IAW DRAWING#141A9502; HEAT TREATMENT REQUIRED TO T6.; [06] RECIVED ATTACH GUSSET FROM OSS PO NUMBER 841036-SWA; LOCATED AND DRILLED ATTACH GUSSET AT BS 261 STR 8L WL 265 PER SRM 51-40-05 AND DWG 141A9502. OK TO TREAT AND PRIME PART; [07] VERIFIED CORRECTIVE ACTION 6.; [08] APPLIED CHEMICAL CONVERTION COATING AND PRIMED ATTACH GUSSET PER AMM 51-21-41-370-802 AND AMM 51-21-72-370-804; OK TO INSTALL PART; [09] VERIFIED CORRECTIVE ACTION 8.; [10] INSTALLED AT FLIGHT DECK P18 CIRCUIT BREAKER PANEL ATTCH GUSSET (SUPPORT CLIP) LOCATED BS 261 STR8L WL 274 IAW SRM 51-40-02. DWG# 141A0720. ALL MAINTENANCE ACTIONS ARE COMPLETE REQUEST FINAL BUYOFF.; [11] VERIFIED CORRECTIVE ACTION 10. ALL WORK COMPLETE.