What was found
FWD CARGO COMPARTMENT FLOOR STRUCTURE INTERCOSTAL S25L BETWEEN STA 500-500A CRACKED ; / [01] REMOVED DAMAGE INTERCOSTAL FROM FWD CARGO PER 737-700 SRM 51-40-02-0G-0-A00729 (GENERAL - FASTENER INSTALLATION AND REMOVAL - AIRFRAME - PERMANENT; [02] REMOVED INTERCOSTAL AS PER SRM 51-40-02-0G-0; [03] LOCATED AND DRILL HOLE NEW INTERCOSTAL AS PER SRM 51-40-05; [04] VERIFIED STEPS 1 TO 3.; [05] OK TO TREAT AND PRIME; [06] TREATED AND PRIMER DRILL HOLE NEW INTERCOSTAL AS PER SRM 51-20-01-0G-0 AND AMM 51-21--72-370-804; [07] VERIFIED 6. OK TO INSTALL INTERCOSTAL; [08] INSTALLED NEW INTERCOSTAL AS PER SRM 51-40-02-0G-0 AND DWG 143A7505.