Service difficulty report · Support · Boeing 7377H4

Difficulty date
October 6, 2021
Submitted
November 22, 2021
Operation
Air carrier
Aircraft
N450WN
Make and model
Boeing 7377H4
Aircraft serial
32470
Aircraft time
58,641 hours, 34,716 cycles
Part
Support
Condition
Corroded
Location
Bs 500a-500c
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON FLOOR TO SIDEWALL SUPPORT BS500A+7; BS500C+2; BS500C+6.5 RBL24 WL156. ; / [01] EVALUATED CORROSION AT ALL LOCATIONS; FOUND DEEPEST LOCATION TO BE AT BS 465 REMOVED 0.010' IN A AREA OF 1'X1' ORIGINAL THICKNESS 0.040' FOUND TO BE OUT OF LIMITS PER SRM 53-30-15-1A-2 USING ATS TOOL ID ATS1225 S/N UNKNOWN; [02] CORRECTION TO CORRECTIVE ACTION STEP 1. EVALUATED CORROSION AT ALL LOCATIONS; FOUND DEEPEST LOCATION TO BE AT BS 500C+2' REMOVED 0.010' IN A AREA OF 1'X1' ORIGINAL THICKNESS 0.040' FOUND TO BE OUT OF LIMITS PER SRM 53-30-15-1A-2 USING ATS TOOL ID ATS1225 S/N UNKNOWN; [03] VERIFIED ACTION 1;2; [04] FABRICATED NEW R/H FLOOR TO SIDEWALL SUPPORT BS 500A TO 500D RBL24 WL 156 FROM EXTRUSION BAC1496-444#7075T62 CLAD LOT# 1467644-1; AND LOCATED AND DRILLED PER SRM 51-40-02-0G-0; DWG 143A7500; AND DWG 143A7501; [05] APPLIED CHEMICAL CONVERSION COATING; PRIMER AND INSTALLED NUTPLATES PER SOPM 20-43-03; AMM 51-21-72-370-804; AND DWG 143A7501; [06] VERIFIED CORRECTIVE 4.; [07] VERIFIED ALL STEPS COMPLETE.; [08] CORRECTION TO CORRECTIVE ACTION STEPS 1 AND 2. IT SHOULD BE SRM 53-00-53-1A-2.

More about the Boeing 737-7H4