What was found
FOUND CRACK IN L/H A/C BAY STA 663 VAPOR BARRIER UPPER ATTACH ANGLE AT LBL 40. REMOVED STIFFENER ON FWD SIDE OF STA 663 LBL 40 TO FOM IAW SRM 51-40-02-0G-0. CUT AND REMOVED DAMAGED ATTACH ANGLE IAW SRM 57-10-10-2R-5 REPAIR 5. PERFORMED DVI OF REPAIR AREA & UNDERLYING STRUCTURE. NO DEFECTS NOTED IAW SRM 57-10-10-2R-5 REPAIR 5. PERFORMED NDT IAW NDT PT.6 51-00-00 PROC 16. NO DEFECTS NOTED . FABRICATED REPAIR PARTS IAW SRM 57-10-10-2R-5 REPAIR 5. TREATED AND PRIMED REPAIR PARTS AND CUT EDGE IAW SRM 57-10-10-2R-5 REPAIR 5. STIFFENER REMOVED ON STEPS 1 AND 2 INSTALLED REPAIR PARTS U CHANNEL AND STIFFENER IAW SRM 57-10-10-2R-5 REPAIR 5.