What was found
ELONGATED HOLE FLOOR STRUCTURE BEAM LOCATED BS986 AND BETWEEN RBL18 TO RBL39 AT AFT GALLEY AREA (2 EA) ; 2021-486671 / [01] REPLACED THE DAMAGE PART (TEE CHORD) TO RESTORE THE AIRCRAFT TO ITS APPROVED CONFIGURATION DEFINED IN EA 1-753-35993 REV IR. SEE INDIVIDUAL SIGNOFFS BELOW.; [02] REPLACED THE DAMAGE PART (TEE CHORD) ON FLOOR STRUCTURE BEAM BS986 AND BETWEEN RBL 60 TO LBL 60 AT AFT GALLEY AREA IAW B737-700 SRM 53-70-51-2R-4 REPAIR 4. SEE INDIVIDUAL SIGNOFFS BELOW.; [03] CORRECTED STEP 1: REPLACED THE DAMAGE PART (TEE CHORD) ON FLOOR STRUCTURE BEAM BS986 AND BETWEEN RBL 60 TO LBL 60 AT AFT GALLEY AREA IAW B737-700 SRM 53-70-51-2R-4 REPAIR 4. SEE INDIVIDUAL SIGNOFFS BELOW.; [04] REPLACED THE DAMAGE PART (TEE