What was found
FWD CARGO COMP.RH FLOOR SHIELD CORRODED AROUND FASTNER HOLES STA.500-500A RBL25 WL.158. BEGAN REMOVING CORROSION ON SPLASH SHIELD AT STA 500 TO 500A; RBL 25 AND WL 158; ORIGINAL .032' LOSS OF .007' REMAINING .025' FOUND OUT OF LIMITS IAW SRM 53-00-53-1A-2. CORROSION STILL EXISTS. REMOVED DAMAGED SHIELD AT FWD CARGO R/H SIDE BS 500 - 500A IAW SRM 51-40-02-0G-O. LOCATED AND DRILL ALL FASTENER HOLES ALSO INSTALLED NEW NUTPLATES INTO NEW FLOOR SHIELD IAW SRM 51-40-05-0G-0 ALSO BOEING DWG 143A0080 REV:- INSPECTION CW STEP 7. INSTALLED NEW R/H SIDE FWD PIT AFT OF DR SHIELD IAW SRM 51-40-02-0G-0 ALSO DWG 143A0080 REV-.