What was found
R1 DOOR CUT OUT UPPER FWD CORNER STUB FRAME CRACKED BETWEEN S-8R AND S-9R ; / [01] REMOVED CRACKED STUB FRAME FROM R1 DOOR FWD UPPER CUT OUT AREA PER B737-700 SRM 51-40-02-0G-0.; [02] LOCATED AND DRILLED NEW STUB FRAME AT R1 DOOR CUT OUT BETWEEN S-8R AND S-9R PER B737-700 SRM 51-10-02-0G-0.; [03] VERIFIED STEPS #1 AND #2; [04] OK TO INSTALL STUB FRAME.; [05] STARTED INSTALLATION OF STUB FRAME AS REF. B737-700 SRM 51-40-02-0G-0; [06] COMPLETED INSTALLATION OF NEW STUB FRAME AT R1 DOOR CUT OUT FWD UPPER CORNER PER B737-700 SRM 51-40-02-0G-0 AND DRWG #141A8370.; [07] VERIFIED STEPS #5 AND #6 STUB FRAME INSTALLATION.