What was found
CORROSION ON B.S. 270 LATERAL BEAM LBL 10 - RBL 10, WL 207.54. REMOVED CORROSION ON LATERAL BEAM LBL 10-RBL 10. AREAS BLENDED ARE 22' BY .850' ON TOP; 6' BY .850' ON UNDERSIDE LBL 3-RBL3; 7' BY .850'ON UNDERSIDE LBL 3- LBL 10; 4' BY .850' ON UNDERSIDE RBL 3-RBL7, 1' BY .850' ON UNDERSIDE RBL 9-RBL 10 IAW SRM 51-10-02-0G-0. ACCOMPLISHED HFEC INSPECTION IAW D6-37239 PART 6 51-00-00 PROC 16 AND 53-30-00 PROC 3. NO CRACKS FOUND. FOUND LATERAL BEAM STA 270 AT LBL 10-RBL 10; WL 207.54 NO APPLICABLE ALLOWABLE DAMAGE, COMPLETED ALL REPAIR STEPS ON FAULT TTG8Q009RVUD WHERE EA M-21-153-00277 IS ATTACHED.