What was found
FWD CARGO; CORROSION ON BAFFLE; R/H SIDE BETWEEN STA. 500B AND 500C ; FWD CARGO - CORROSION ON TOP OF AFFLE WHERE IT ATTACHES TO OTTOM SIDE OF TRANSITION ANGLE; RH SIDE ETWEEN STATIONS 500B AND 500C. / [01] REMOVED CORROSION PER SRM 51-10-02. DAMAGE IS EXTENSIVE AND IS OUT OF LIMITS. BAFFLE WILL NEED TO BE REPLACED.; [02] REMOVED BAFFLE; LOCATED AND DRILLED NEW BAFFLE PART #143A7510-20 PER SRM 51-40-02. INSTALLED NEW BAFFLE PER SRM 51-40-02.; [03] REMOVED AND REPLACED FWD CARGO BAFFLE; R/H SIDE BETWEEN STA. 500B AND STA. 500C IAW SRM 51-40-02.; [04] VERIFIED INSTALLATION