Service difficulty report · Angle · Boeing 7378H4

Difficulty date
December 16, 2021
Submitted
January 12, 2022
Operation
Air carrier
Aircraft
N8676A
Make and model
Boeing 7378H4
Aircraft serial
36941
Aircraft time
20,537 hours, 9,518 cycles
Part
Angle
Condition
Corroded
Location
Fuselage
Stage of operation
UK
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(DOT 67-08) FWD CARGO COMPARTMENT STA 500G+15 LBL 24; Z ANGLE IS CORRODED. ; / [01] REMOVED CORROSION AT FWD CARGO STA 500G+15 LBL24 Z ANGLE AND PERFORMED 10X MAGNIFYING GLASS I/A/W SRM 53-00-53-1A-2; [02] VERIFIED MATERIAL LOSS LOSS OF .006 ORIGINAL.040 REMAINING .034 IS OUT OF LIMITS I/A/W SRM 53-00-53-1A-2 AAR TOOL 29270 DUE 12-09-22; [03] INSPECTION VERIFIED STEP 2; [04] VERIFIED NEW Z ANGLE AND SPLICE SIDEPLATE P/N BAC1496-444-7075-T6 A TAG #A67392 FROM STA 500D TO 500I I/A/W SRM 53-00-53-2R-5 REPAIR 5; [05] VERIFIED ITEM 4; [06] STARTED FABRICATE NEW Z ANGLE I/A/W SRM 53-00-53-1A-2; [07] FABRICATED NEW Z ANGLE AND SPLICE SIDEPLATE I/A/W SRM 53-00-53-2R-5 REPAIR 5 FROM 500D TO 500L; [08] VERIFIED ITEMS 6 AND 7<BR><BR>OK TO TREAT AND PRIME; [09] ALODINED AND PRIMED NEW Z ANGLE AND SPLICE SIDEPLATE I/A/W AMM 51-21-41-370-803 AND 51-21-72-370-804; [10] INSPECTION CW STEP 9; [11] OK TO INSTALL ZEE ANGLE REPAIR PARTS; [12] INSTALLED ZEE ANGLE AND REPAIR PARTS I/A/W SRM51-40-02-0G-0 AND 53-00-53-2R-5 REPAIR 5; [13] INSTALLED ALL GLUE ON NUTPLACES ON NEW ZEE ANGLE AND REPAIR PARTS I/A/W SRM 51-40-10-2R-0 A TAG A99876 AND PERFORMED NUTPLATE PUSHOFF STRENGTH TEST I/A/W SRM 51-40-10-2R-0. AAR TOOL 41801 DUE 03-08-22 OPS CHECK GOOD; [14] ALL STEPS 1-14 COMPLETE FOR REPAIR; [15] VERIFIED ITEMS 12 THROUGH 14<BR><BR>AUDIT C/W

More about the Boeing 737-8H4