Service difficulty report · Seal · Boeing

Difficulty date
March 30, 2017
Submitted
January 14, 2022
Operation
Air carrier
Make and model
Boeing
Aircraft time
10,052 hours, 4,380 cycles
Part
Seal
Condition
Cracked
Location
R/H Horiz. Stab.
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

RT HORZT STAB UPPER SLIDING SEAL CRACKED / R&R'D RT HORZT STAB; UPPER FWD SLIDING SEAL REF AMM 53-31-31. 17857