Service difficulty report · Bulkhead · Boeing

Difficulty date
April 11, 2017
Submitted
January 21, 2022
Operation
Air carrier
Make and model
Boeing
Aircraft time
37,435 hours, 24,563 cycles
Part
Bulkhead
Condition
Corroded
Location
Fwd Cargo Bay
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

***CORROSION*** BULKHEAD SUPPORT ANGLE STA 500D RBL 26; WL 157 / NO ALLOWABLE DAMAGE LISTED IN THE SRM; PART TO BE REPLACED PER SRM 51-10-02-0G-0; ITEM 9. REMOVED DAMAGED BULKHEAD SUPPORT AT F/S 500D; R/H; AND LOCATED AND DRILLED AND INSTALLED REPLACEMENT SUPPORT PER SRM 51-40-02-0G-0; SRM 51-40-05-0G-0; 87667U 20/APR/17. REMOVED AND INSTALLED NEW FASTENERS AT BS 500D STR 21 AND STR 22 R/H PER SRM 51-40-02-0G-0. STEP 4B 88415U 21APR17