Service difficulty report · Strip · Boeing

Difficulty date
April 12, 2017
Submitted
January 21, 2022
Operation
Air carrier
Make and model
Boeing
Aircraft time
34,577 hours, 20,360 cycles
Part
Strip
Condition
Corroded
Location
Aft Cargo Bay
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFT CARGO; L/H TRANSITION ANGLE STA 727+4 TO 847 MISSING NUTPLATES; CORROSION SEVERAL LOCATIONS; / REPLACED L/H TRANSITION ANGLE FROM STA 727+4 TO 847 PER SRM 53-00-53-2R-5 AND SRM 51-40-02. SEE INDIVIDUAL SIGN OFFS FOR ALL WORK PERFORMED.