Service difficulty report · Seal · Boeing

Difficulty date
May 5, 2017
Submitted
January 24, 2022
Operation
Air carrier
Make and model
Boeing
Aircraft time
24,694 hours, 14,608 cycles
Part
Seal
Condition
Cracked
Location
Rt Horiz Stab
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

RIGHT HORIZONTAL STAB FWD UPPER SLIDING SEAL CRACKED. / REMOVED AND REPLACED RIGHT HORIZONTAL STAB FWD UPPER SLIDING SEAL PER AMM 53-31-31.