Service difficulty report · Door · Boeing

Difficulty date
May 9, 2017
Submitted
January 24, 2022
Operation
Air carrier
Make and model
Boeing
Aircraft time
33,336 hours, 15,653 cycles
Part
Door
Condition
Cracked
Location
Main Fuselage
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

EXT ELECTRICAL DOOR AFT LANDING HAS CRACK AT RIVET HOLE FOR LANDING PAD / REMOVED DAMAGE AREA OF EGPR DOUBLER PER SRM 53-10-15-2R-4 REPAIR 4. PERFORMED HFEC OF CUT OUT AREA PER NDT PART 6 51-00-00 PROC 23. NO DEFECTS NOTED. FABRICATED REPAIR PARTS; TREATED AND PRIMED PARTS PER SRM 53-10-15-2R-4. INSTALLED REPAIR PARTS PER SRM 53-10-15-2R-4