Service difficulty report · Seal · Boeing

Difficulty date
May 25, 2017
Submitted
January 26, 2022
Operation
Air carrier
Make and model
Boeing
Aircraft time
34,735 hours, 20,390 cycles
Part
Seal
Condition
Cracked
Location
Horizontal Stab
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

RIGHT HORIZONTAL STAB FWD UPPER SLIDING SEAL CRACKED / REMOVED AND REPLACED RIGHT HORIZONTAL STAB FWD UPPER SLIDING SEAL PER AMM 53-31-31.