Service difficulty report · Support · Boeing 7377H4

Difficulty date
January 6, 2022
Submitted
January 31, 2022
Operation
Air carrier
Aircraft
N233LV
Make and model
Boeing 7377H4
Aircraft serial
32501
Aircraft time
53,746 hours, 31,891 cycles
Part
Support
Condition
Corroded
Location
Aft Cargo Bay
Stage of operation
NR
How discovered
9
Nature of condition
O
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON AFT CARGO BAY FLOOR TO SIDEWALL AT RBL 21 BS 867; BS 867+15; BS 927+4; BS 927+12. ; / [01] EVALUATED CORROSION; THE CORROSION AT BS 867 AND BS 867+15 ARE EVALUATED ON CUST CARD#TTG8Q00A5VCW; FOUND DEEPEST AREA TO BE AT BS 927+12 RBL 21 WL 178; FOUND 0.015 REMOVED FROM ORIG 0.040 IN 1'X1' AREAS FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING DIAL DEPTH GAUGE ATS 2677; [02] VERIFIED CORRECTIVE ACTION ITEM 1.; [03] RECEIVED NEW ACB FLOOR TO SIDEWALL SUPPORT <BR><BR>ITEM : 146A7502-56<BR>PO# : 845703/2; [04] REMOVED ACB FLOOR TO SIDEWALL SUPPORT BS 867 - 887 RBL21 IAW SRM 51-40-02-0G-0; [05] LOCATED AND DRILLED NEW FLOOR TO SIDEWALL SUPPORT IAW SRM 51-40-05-0G-0 AND DWG 146A7502 REV : -; [06] RECEIVED NEW ACB FLOOR TO SIDEWALL SUPPORT <BR><BR>ITEM : 147A7501U17<BR>PO# : 842226/1; [07] REMOVED ACB FLOOR TO SIDEWALL SUPPORT BS 867 - 947.5 RBL21 IAW SRM 51-40-02-0G-0; [08] LOCATED; DRILLED AND COUNTERSANK NEW FLOOR TO SIDEWALL SUPPORT IAW SRM 51-40-05-0G-0; SRM 51-40-08-0G-0 AND DWG 147A7501 REV:A; [09] EDITED CORRECTIVE ACTION STEP 3;4;5 TO STEP 6;7;8; [10] VERIFIED CORRECTIVE ACTION #8; [11] OK TO INSTALL; [12] VERIFIED OK TO INSTALL; [13] INSTALLED ACB NEW FLOOR TO SIDEWALL SUPPORT AT RBL21 BS 867 - 947.5 IAW SRM 51-40-02-0G-0; DWG 147A7500 REV:-; DWG 147A9409 REV:-; AND DWG 147A0060 REV:-; [14] VERIFIED CORRECTIVE ACTION #13; [15] VERIFIED ALL STEPS COMPLETE

More about the Boeing 737-7H4