What was found
FWD CARGO COMPARTMENT FLOOR TO SIDEWALL SUPPORT BRACKET CRACKED BS 420 RBL 25 WL 156 LOCATED; DRILLED; APPLIED CHEMICAL CONVERSION COATING; AND APPLIED PRIMER TO NEW FCB FLOOR TO SIDEWALL SUPPORT BRACKET IAW DWG 143A1212; 143A7505; SRM 51-40-05-0G-0; AMM 51-21-41-370-802; AND AMM 51-21-72-370-804. REMOVED FCB FLOOR TO SIDEWALL SUPPORT IAW SRM 51-40-02-0G-0; [04] CORRECTED BY ADDING BRACKET TO FCB FLOOR TO SIDEWALL SUPPORT. INSTALLED NEW FCB FLOOR TO SIDEWALL SUPPORT BRACKET BS420; RBL 25; WL 156 PER DWGS 143A1212; 143A7505; AND SRM 51-40-02-0G-0.