What was found
BS 663 VAPOR BARRIER UPPER ATTACH ANGLE CRACKED AT RBL 8 WL 160. CUT AND REMOVED THE DAMAGE IAW SRM 57-10-10-2R-5, REPAIR 5, DETAIL B. HFEC ROTARY INSPECTED ALL INITIAL FASTENER HOLES IN THE REPAIR AREA IAW NDT PART 6 51-00-00 PROCEDURE 16. NO CRACKS FOUND. ACCOMPLISHED DVI OF REPAIR AREA, GENERATED FAULT TTG8Q009Z0ZK FOR DEFECT NOTED. LOCATED AND DRILLED -1 REPLACEMENT ANGLE, AND -2 SPICE ANGLE. TREATED AND PRIMED REPAIR PARTS AND REWORKED AREA IAW SRM 57-10-10-2R-5 REPAIR 5. INSTALLED -1 REPLACEMENT ANGLE AND -2 SPLICE ANGLE IAW SRM 57-10-10-2R-5 REPAIR 5; SRM 51-40-02-0G-0 AND DWG 111A1000 ;ID:0114; REV:-.