What was found
SUPPLEMENTAL INFORMATION: AFT CARGO COMPT L/H ZEE CHANNEL BETWEEN STA 727B STA 767 UPPER SURFACE CORROSION ; / [01] REMOVED CORROSION AT AFT CARGO COMP L/H ZEE CHANNEL BETWEEN STA 727B AND STA 767 IAW 737-700 SRM 51-10-02-0G-0; [02] VERIFIED STEP #1;EVALUATED REWORKED AREA; ORIGINAL MATERIAL 0.040'; MATERIAL REMOVED 0.008'; MATERIAL REMAINING 0.032'; FOUND OUT OF LIMITS IAW B737-700 SRM 53-00-53-1A-2 FIG. 103 DETAIL D; [05] VERIFIED STEP #4.; [06] REMOVED OUT OF LIMITS ZEE CHANNEL AT AFT CARGO COMPARTMENT L/H BETWEEN STA 727B AND STA 767 IAW 737-700 SRM 51-40-02-0G-0; [07] LOCATED AND DRILLED NEW ZEE CHANNEL AND NEW SPLICE IAW B737-700 SRM 51-40-05-0G-0; SRM 53-00-53-2R-5 AND DWG # 146A7500. MATERIAL USED: BAC1496-377 7075T6; PO#: 1742711;OK TO TREAT AND PRIME NEW ZEE CHANNEL AND SPLICE.; [10] TREATED AND PRIMED NEW ZEE CHANNEL AND NEW SPLICE IAW B737-700 SRM 51-20-02-0G-0; [11] VERIFIED STEP #10.; [12] OK TO INSTALL NEW SPLICE; [13] INSTALLED NEW SPLICE ON NEW ZEE CHANNEL IAW B737-700 SRM 51-40-02-0G-0 AND SRM 53-00-53-2R-5; SPLICE INSTALLED.; [15] LOCATED AND DRILLED NEW ZEE CHANNEL AND NEW SPLICE IAW B737-700 SRM 51-40-05-0G-0; SRM 53-00-53-2R-5 AND DWG # 146A7500. MATERIAL USED: BAC1496-377 7075T6; PO#: 1742711. NEW ZEE CHANNEL INSTALLATION WHIT BE ACCOMPLICE ON ROUTINE CARD TTG8Q004FG8H.; [16] FINAL INSPECTION; NEW ZEE CHANNEL INSTALLATION WILL BE ACCOMPLISH ON ROUTINE CARD TTG8Q004FG8H.