What was found
SUPPLEMENTAL INFORMATION: AFT CARGO COMPT L/H ZEE CHANNEL BETWEEN STA 767 AND STA 847 UPPER SURFACE CORROSION ; / [01] REMOVED CORROSION AT AFT CARGO COMP L/H ZEE CHANNEL BETWEEN STA 767 AND STA 847 IAW 737-700 SRM 51-10-02-0G-0; [02] VERIFIED STEP #1; [03] PERFORMED UT THICKNESS INSP ON REWORKED AREA. IAW B 737 NDT PART 4 51-00-00 PROCE 3. TOOL 27MG. BC 172139. 4-1-22. MINNI THICK 0.032'.; [04] EVALUATED REWORKED AREA; ORIGINAL MATERIAL 0.040'; MATERIAL REMOVED 0.008'; MATERIAL REMAINING 0.032'; FOUND OUT OF LIMITS IAW B737-700 SRM 53-00-53-1A-2 FIG. 103 DETAIL D; [05] VERIFIED STEP #4.; [06] REMOVED OUT OF LIMITS ZEE CHANNEL AT AFT CARGO COMPARTMENT L/H BETWEEN STA 767 AND STA 847 IAW 737-700 SRM 51-40-02-0G-0; [07] LOCATED AND DRILLED NEW ZEE CHANNEL IAW B737-700 SRM 51-40-05-0G-0 AND DWG #:146A7500; MATERIAL USED BAC1496-377 7075T6; PO#: 1742711; [08] VERIFIED STEP #6 AND #7.; [09] OK TO TREAT AND PRIME.; [10] TREATED AND PRIMED NEW ZEE CHANNEL IAW SRM 51-20-01-0G-0; [11] VERIFIED STEP #10.; [12] LOCATED AND DRILLED NEW ZEE CHANNEL L/H BETWEEN STA 767 AND STTA 847 IAW B737-700 SRM 51-40-05-0G-0; AND DWG # 146A7500. MATERIAL USED: BAC1496-377 7075T6; PO#: 1742711. NEW ZEE CHANNEL INSTALLATION WHIT BE ACCOMPLICE ON ROUTINE CARD TTG8Q004FG8H.; [13] FINAL INSPECTION; NEW ZEE CHANNEL INSTALLATION WILL BE ACCOMPLISHED ON ROUTINE CARD TTG8Q004FG8H.