What was found
PANEL BREAK AT BS 540; RBL 1; WL 208 IS CRACKED / REMOVED FLOOR SUPPORT AT BS 540; RBL 1; WL 208; REC'D NEW FLOOR SUPPORT; LOCATED AND DRILLED; INSTALLED IAW SRM 51-40-02-0G-0_AND 51-40-05-0G-0
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PANEL BREAK AT BS 540; RBL 1; WL 208 IS CRACKED / REMOVED FLOOR SUPPORT AT BS 540; RBL 1; WL 208; REC'D NEW FLOOR SUPPORT; LOCATED AND DRILLED; INSTALLED IAW SRM 51-40-02-0G-0_AND 51-40-05-0G-0