What was found
#6 FLAP TRACK FAIRING HAS 2 FASTENERS PULLED THROUGH ON OUTBOARD SEAL ATTACHMENT / PERFORMED INTERIM REPAIR PER SRM 57-53-70-2R-2 DVI OF REPAIR REQUIRES EVERY 500 CYCLES
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
#6 FLAP TRACK FAIRING HAS 2 FASTENERS PULLED THROUGH ON OUTBOARD SEAL ATTACHMENT / PERFORMED INTERIM REPAIR PER SRM 57-53-70-2R-2 DVI OF REPAIR REQUIRES EVERY 500 CYCLES