What was found
SUPPLEMENTAL INFORMATION: FWD CARGO COMPARTMENT L/H AFT ZEE CHANNEL UPPER SURFACE BETWEEN STA 480 TO 500C STR 26L HAS CORROSION AROUND FASTENERS HOLES ; / [01] REMOVAL AND INSTALLATION OF ZEE CHANNEL BEING ACCOMPLISHED ON CARD #TTG8Q00A0VS7; [02] CORROSION AROUND FASTENER HOLES FOUND OUT OF LIMITS REF. B737-7 SRM 53-00-53-1A-2; [03] REMOVED DAMAGED SECTION OF ZEE CHANNEL AT PREVIOUS SPLICE AREA AT STA. 490 TO 500D; REF. B737-7 SRM 51-40-02-0G-0; [04] LOCATED AND DRILLED NEW ZEE CHANNEL SECTION REF. B737-7 SRM 51-40-05-0G-0; AND DRW. #143A7500; [05] VERIFIED STEP 4; [06] OK TO TREAT AND PRIME ZEE CHANNEL; [07] TREATED AND PRIMED ZEE CHANNEL REF. B737-7 SRM 51-20-01-0G-0; [08] INSTALLED ANCHOR NUTS ON ZEE CHANNEL AND INSTALLED REPAIR REF. USED B737-7 SRM 51-40-02-0G-0; 53-0053-2R-6; AND DRW #143A7500; [09] REMOVED DAMAGED SECTION OF ZEE CHANNEL AT PREVIOUS SPLICE AREA AT STA. 490 TO 500D; FABRICATED AND REPLACE ZEE CHANNEL REF. USED B737-7 SRM 51-40-02-0G-0; 51-40-05-0G-0; 51-20-01-0G-0; 53-00-53-2R-6 AND DRW #143A7500; [10] VERIFIED STEP 9