What was found
SUPPLEMENTAL INFORMATION: FWD CARGO COMPARTMENT R/H SIDE ZEE CHANNEL BETWEEN STA 490 TO 500C STR 26R HAS CORROSION AROUND FASTENERS HOLES ; ACTAL LOCATION IS FWD CARGO RH SIDE STA 490 TO STA 500 STR 26R / [01] REMOVED ZEE-CHANNEL ACCOMPLISSHED ON TTG8Q004FHQD; [02] REMOVED CORROSION AT FWD CARGO COMPARTMENT R/H SIDE ZEE CHANNEL BETWEEN FS 490 TO 500C STRINGER 26R IN REF B737-700 SRM 51-10-02-0G-0; [03] AFTER REWORK AREA ;FOUND OUT OF LIMITS ZEE-CHANNEL IN REF B737-700 SRM 53-00-53-1A-2 PARRAGRAFH 4.A(2)(A);FIGURE 103 ;DETAIL D; [04] LOCATED AND DRILLED NEW HOLES AT ZEE-CHANNEL IN REF B737-700 SRM 51-40-05-0G-0; [05] VERIFIED STEP 4<BR>OK TO TREAT AND PRIME; [06] TREATED AND APPLY PRIMER AT NEW HOLES AT ZEE-CHANNEL IN REF VB737-700 SRM 51-20-01-0G-0; [07] VERIFIED STEP 6; [08] INSTALLATION ZEE-CHANNEL WILL BE ACCOMPLISHED ON TTG8Q004FHQD; [09] REMOVED CORROSION AT FWD CARGO COMPARTMENT R/H SIDE ZEE CHANNEL BETWEEN FS 490 TO 500C STRINGER 26R IN REF B737-700 SRM 51-10-02-0G-0;AFTER REWORK AREA ;FOUND OUT OF LIMITS ZEE-CHANNEL IN REF B737-700 SRM 53-00-53-1A-2 PARRAGRAFH 4.A(2)(A);FIGURE 103 ;DETAIL D.LOCATED AND DRILLED NEW HOLES AT ZEE-CHANNEL IN REF B737-700 SRM 51-40-05-0G-0.TREATED AND APPLY PRIMER AT NEW HOLES AT ZEE-CHANNEL IN REF VB737-700 SRM 51-20-01-0G-0; [10] VERIFIED STEP 9