As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
SUPPLEMENTAL INFORMATION: #6 FLAP FAIRING SEAL FASTENER HOLE ELONGATED / PERFORMED INTERIM REPAIR PER SRM 57-53-70-2R-2 ALTERNATIVE 1; REQUIRES DVI OF INTERIM REPAIR EVERY 500 FLIGHT CYCLES. IF DAMAGED IS FOUND REPAIR MUST BE PERMANENTLY REPAIRED