What was found
CORROSION ** AFT CARGO COMPARTMENT BILGE ZEE CHANNEL @ S-25L FROM STA 727B TO STA 847 ; / [01] REMOVED CORROSION AT AFT CARGO COMP. BILGE ZEE CHANNEL AT S-25L FROM STA 727B TO STA 847 PER REF B737-700 SRM 51-10-02-0G-0.; [02] VERIFIED STEP 1.; [03] PERFORMED UT THICKNESS INSP. ON REWORKED AREA @ AFT CARGO COMPT BILGE Z-CHANNEL S-25L FROM STA 727B TO STA 847 IAW B737 NDT PART 4 51-00-00 PROC. 3. MIN THICKNESS .025'; EQUIP: OLYMPUS 27MG CAL DUE: 4/22 B/C 172139; [04] EVALUATED REWORKED AREA; ORIGINAL THICK .040'; MATERIAL REMOVED .015'; MATERIAL REMAINING .025' FOUND AREA BETWEEN STA 747 TO STA 767 L/H SIDE OUT OF LIMITS AS PER REF B737 SRM 53-00-53-1A-2 FIG 103.; [05] VERIFIED STEP 4.; [06] FABRICATED ZEE CHANNEL FROM EXISTENCE SPLICE STA 747 TO STA 847 AS AS PER BOEING DWG 146A7502.; [07] VERIFIED STEP 6. OK TO TREAT AND PRIMER.; [08] TREATED AND PRIMED ZEE CHANNEL SECTION PER REF B737-700 AMM 51-21-41-701;AMM 51-21-72-370-804; [09] REMOVED CORROSION AT AFT CARGO COMP. BILGE ZEE CHANNEL AT S-25L FROM STA 727B TO STA 847;EVALUATED REWORKED AREA; ORIGINAL THICK .040'; MATERIAL REMOVED .015'; MATERIAL REMAINING .025' FOUND AREA BETWEEN STA 747 TO STA 767 L/H SIDE OUT OF LIMITS;FABRICATED ZEE CHANNEL FROM EXISTENCE SPLICE STA 747 TO STA 847.PER REF B737-700 SRM 51-10-02-0G-0. SRM 53-00-53-1A-2 FIG 103. DWG 146A7502.; [10] VERIFIED STEP 8 AND STEP 9.