What was found
R/H AFT CARGO Z CHANNEL LOWER SIDE FROM ST 907 TO ST 907+1 RBL 21 HAS CORROSION AROUND THE HOLE. ; / [01] REMOVED CORROSION AT AFT CARGO COMP ZEE CHANNEL LOWER SIDE AT STA 907+1 RBL 21 PER REF B737-700 SRM 51-02-0G-0.; [02] EVALUATED DAMAGE AREA; FOUND CORROSION WENT THROUGH ; OUT OF LIMITS PER REF B737-700 SRM 53-00-53-1A-2; [03] VERIFIED STEP 1 AND STEP 2.; [04] FABRICATED ZEE CHANNEL FROM EXISTENCE SPLICE STA 887 TO STA 947.5 AS PER BOEING DWG 147A7501.; [05] VERIFIED STEP 4. OK TO TREAT AND PRIMER.; [06] TREATED AND PRIMED NEW SECTION ZEE CHANNEL FROM STA 887 TO STA 947.5 PER REF B737-700 AMM 51-21-41-370-802; AMM 51-21-72-370-804.; [07] VERIFIED STEP 6.; [08] REMOVED CORROSION AT AFT CARGO COMP ZEE CHANNEL LOWER SIDE AT STA 907+1 RBL 21;EVALUATED DAMAGE AREA; FOUND CORROSION WENT THROUGH ; OUT OF LIMITS;FABRICATED ZEE CHANNEL FROM EXISTENCE SPLICE STA 887 TO STA 947.5 PER REF B737-700 SRM 53-00-53-1A-2 ;DWG 147A7501.AMM 51-21-41-370-802; AMM 51-21-72-370-804.; [09] VERIFIED STEP 8.; [10] CORRECTED MEASUREMENT TABLE.